INSTALLATION
INSTALLATION
5 ASSEMBLY
Before beginning to install:
− Switch the electricity supply to the storage cylinder's
valve group and to any associated boiler OFF at the main
switch and at the control panel
− Close the shut-off cocks for the domestic hot water circuit
− Empty the boiler's domestic circuit.
9
Installation is possible on two different types of storage cyl-
inder: with nuts (TYPE 1) or with screws (TYPE 2).
TYPE 1 STORAGE CYLINDER
TYPE 2 STORAGE CYLINDER
INSTALLATION ON TYPE 1 STORAGE CYLINDER
− Remove the cover (A) of the flange with the insulation (B)
− An M8 screw (C) is fitted onto the insulation (B) for remov-
ing the flange.
9
Keep the M8 screw (C) for use for future inspections.
− Undo the nuts (D).
− Remove the flange (E) from the storage cylinder, tighten-
ing the M8 screw (C) into the threaded hole (F).
− Check the state of wear of the gasket (G) and, if necessary,
replace it with the gasket included with the accessory.
13
9
Keep the nuts (D), as they will be used later to fasten the
element.
16
C
B
A
F
C
G
D
E