Check For Leaks - BWT L 3000 Instrucciones De Montaje Y De Servicio

Descalcificador rápido
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 24
GB
7
6
5
12
3
1
10
2
4
11
Use requirements
For gas and electric flow heaters, the regulator
piece must not be included in the deliming
circulation.
Rapid deliming of pipelines
The pipeline must not exceed a height of 10m. At
greater heights the line must be separated into
sections using stop valves.
Operation
Caution! Before start-up:
Check the connecting line for damage.
Denmark: Check the switch cover for damage.
Portable operating equipment must be tested
every 6 months by a qualified electrician in ac-
cordance with BGV A2.

Check for leaks

Check connection hoses and attach them to the
double reducing nipple.
Unscrew the cover of the filling opening (10) and fill
the BWT L 3000 with 20 - 30 liters of water (ob-
serve minimum fill level (11)).
Insert mains plug (6). Adjust the multifunctional
valve (7) to max. and make sure the connection
hoses are properly sealed and inserted. Remove
mains plug.
Deliming
Note: If more liquid is required (wa-
ter and solvent) than fits in the sol-
vent container of the BWT L 3000,
a stop valve must be integrated into
Danger!
the supply line.
Stop valves can be purchased from specialized
dealers.
Interrupt electrical connection or close the gas sup-
ply line. Disconnect the device to be delimed from
the water pipeline and drain it.
Attach the connection hoses (8) to the supply and
return lines of the device to be delimed.
Screw the pouring aid onto the opening (3), attach
a hose with an inside diameter of 20mm and place
the other end in the open to degas.
Tabla de contenido
loading

Tabla de contenido