1
1
2
6
2
3
English
Roughing-in
This unit must be installed with showerpipe rough set
16181181 (not included).
To insure correct operation of the
thermostatic mixing valve, the hot
supply must be on the left and the
cold supply must be on the right.
Turn the water off at the main.
Remove the spacing jig, nuts, and plugs.
Confirm that the nipples are level in all planes and
are parallel to each other.