Teuco P12 Instrucciones De Montaje página 19

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 22
CONNECTION POINTS
1
- Hot water connection for 1/2"
- Cold water connection for 1/2"
X - Height of shower base
(The height above ground indicated for hot and cold
connections will vary according to the height of the shower
base)
A - Column fixing area
The product must be installed exactly as supplied by Teuco,
otherwise claims under warranty will not be accepted.
The installer must observe the assembly instructions, using only
the tools and materials recommended, and the accessories
supplied with the product.
The column must be installed with the floor and walls finished
and the shower base in place.
Make certain the pipelines are not routed through area A.
All the fasteners needed for assembly purposes are in the bag "A-B".
This manual is an integral part of the product and must be kept
for future reference.
PREPARING THE FIXING CENTRES
2
- Mark the centres for the wall fixing holes, according to the
version: corner or wall.
Drill the wall at the centres and clean the shower base.
PREPARING THE EQUIPPED COLUMN
3
- Fit the hand-held shower slider to the rail.
A
Fit the bottom arm to the shower rail and secure with the
screw.
3
- Attach the bottom arm to the column at the appropriate angle
B
according to the version, corner or wall, and secure with the
screw and washer. Clip on the decor cap.
3
- Fit the top arm to the shower rail and secure with the screw.
C
3
- Attach the top arm to the column and secure with the screw
D
and washer. Clip on the decor cap.
FITTING THE OVERHEAD SHOWER ARM
4
- Secure the arm of the showerhead to the column with the
A
screws and washers as indicated.
4
- Make the hose connection 5 to the showerhead.
B
5
FIXING THE WALL BRACKETS
C
V
:
ORNER
ERSION
Fit the clip nuts to the brackets as indicated.
Fix the brackets to the wall with the fasteners indicated
W
V
:
ALL
ERSION
Fit the cap nut to the stud and screw into the wall, observing
the distance indicated.
With the stud in place, remove the cap nut.
Fit the clip nuts to the bracket as indicated.
Fix the bracket to the wall with the fasteners indicated.
Assembly Instructions Art.P12 - P13
IMPORTANT
FITTING THE SEAT AND FOOT MASSAGE
6
A
- Open out the bracket fixed to the equipped column, position
the seat on the bracket and secure with the screws as
indicated.
6
B
-
Locate the seal in the end of the flexible hose.
Screw the end of the hose to the fitting on the column.
Hang the foot massage on the pin fixed to the equipped
column.
FITTING THE COLUMN - PLUMBING CONNECTIONS
7
- Hook the equipped column onto the wall bracket.
A
-
7
Connect the hot and cold water inlet hoses of the column to
B
the elbow fittings on the wall, prepared previously.
- Hot water connection (95 cm hose).
- Cold water connection (95 cm hose).
9 - Connection for hand-held shower.
SECURING THE EQUIPPED COLUMN
8
- Secure the column to the wall brackets with the fasteners
indicated, according to the version - corner or wall - making
certain it is tight against the wall.
FITTING THE COVER TRIMS
9
- Fit the top and bottom trims to the column with the screws as
indicated.
FITTING THE SHOWERHEAD
10
- Screw the showerhead onto the arm fitted previously.
CHECKING THE PLUMBING CONNECTIONS
Having made the connections, check that there are no leaks at the
fittings and that everything works as it should.
REPLACING THE SHELVES
11
- To replace the shelves:
- remove the top cover trim (see step 8)
- loosen the nuts under the shelves with the hex key provided
- remove the shelves by sliding upwards to free them from the
track.
To fit the shelves, repeat the same sequence of steps in
reverse order.
GB
19
loading

Este manual también es adecuado para:

P13