GB
INSTALLATION INSTRUCTION –
ROOF RAILS
Please note:
If possible, roof rails should be fitted in a Ford workshop.
Adhere closely to fitting order as shown in Figures
1 to 9.
1.
Pull off cover strip on left- and right-hand side from
back to front.
2.
Remove sealing compound around fixing holes.
3.
Clean all fixing holes.
4.
Protect all fixing holes against corrosion as descri-
bed in Ford Service Information.
5. - 6. Attach and firmly press down new cover strips left
and right, as shown.
7. - 8. Fit roof rails right and left as shown and hold in
position evenly with M6 bolts.
Tighten all 8 bolts to a torque of 12 Nm.
9.
Fit caps as specified and click in.
Safety hint:
For permitted load capacity of these roof rails, please refer
to operating instructions for vehicle. The total weight of
roof rails is approx. 3.5 kg.
Do not exceed permitted vehicle weight.
2/14
SK8V4J 550B12 AA
D
EINBAUANLEITUNG – DACHRELING
Achtung:
Die Montage der Dachreling sollte möglichst in einer Ford
Werkstatt durchgeführt werden.
Einbaufolge wie auf Abbildungen 1-9 genau einhalten.
1.
Abdeckleiste an linker und rechter Seite von hinten
nach vorne abziehen.
2.
Im Bereich der Befestigungslöcher die Dichtmasse
entfernen.
3.
Alle Befestigungslöcher reinigen.
4.
Alle Befestigungslöcher, gemäß Ford Service
Information, gegen Korrosion schützen.
5.-6.
Wie gezeigt, neue Abdeckleisten links und rechts auf-
kleben und festdrücken.
7.-8.
Dachreling rechts und links wie gezeigt aufsetzen und
mit M6 Schrauben gleichmäßig beiziehen.
Alle 8 Schrauben mit 12Nm Drehmoment anziehen
9.
Abdeckkappen nach Beschreibung aufstecken und
verrasten lassen.
Sicherheitshinweis:
Die zulässige Traglast für diese Dachreling ist der
Bedienungsanleitung des
Fahrzeuges zu entnehmen. Das Gewicht der kompletten
Dachreling ist ca. 3,5kg.
Zulässiges Fahrzeuggewicht nicht überschreiten
HM02 E 12049758 000
©
Copyright Ford 2008