3. Assembly and Installation
3.4.
Commissioning
If there is not already one in place, the nameplate delivered with every separator must be
attached via a chain to the underside of the telescopic dome shaft cover. To commission
the separator, fill it with grease-free and oil-free water until the water begins to flow out of
the discharge pipe.
KLsepa.pop
29