2.3
Changes to the design / construction
Inspections by a technical expert are required before recommissioning (date, type of change, technical
expert signature).
______________________________________________________________________________________________________
______________________________________________________________________________________________________
Name, address of technical expert
_________________________________________________
Location, date
2.4
Changing the assembly location
Inspections by a technical expert are required before recommissioning (date, type of change, specialist
signature).
______________________________________________________________________________________________________
______________________________________________________________________________________________________
Name, address of technical expert
_________________________________________________
Location, date
72
_________________________________________________
Technical expert signature
_________________________________________________
Signature of Technical Expert of Safety inspections
OPI-POWER LIFT HF 3S 5000 - HYMAX HF 3S 5000-V1.1-DE-EN-FR-ES-IT