VMB TL - A150 Manual De Instrucciones página 11

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Quick Operation Guide
CONTENTS
1.
Introduction.
2.
Technical information.
3.
How to place the load
4.
How to load structures
5.
How to load a bridge
6.
Guarantee
7.
Certifications
1.
INTRODUCTION
Dear customer,
In order to operate the towerlift TL-A150 in
a safe and reliable manner, follow the
instructions in this booklet.
Before operating the lift, read the instructions
carefully.
Please note the technical information.
Our products undergo very rigorous testing
under strict conditions and they are monitored
continuously during the manufacturing
process.
In order to guarantee the lift function and
safety, the original parts of the manufacturer's
design must be used. If any parts other than
those of the manufacturer are used, or the
product is modified in any way, the user
forfeits all warranty rights to claim.
VMB reserves the right to modify the
product specifications without prior notice.
The model type, production year
serial number must be quoted in any
queries or orders for spare parts.
2. TECHNICAL IINFORMATION
2.1 - Towerlift TL-A150.
PRO LIFTS S.L.
2.2 - Designed to lift loads vertically to
different heights to support lighting systems.
2.3 - Maximum load : 150 Kg / 331lb.
2.4 - Minimum load : Can be lifted with no
weight.
2.5 - Maximum height : 5.3 m (17.4')
2.6 - Minimum height : 1.54 m (5')
2.7 - Area of base : 1.7 x 1.85 m
and
v12.03 - Depósito legal y Copyright 2012. Todos los derechos reservados.
ENGLISH
Tabla de contenido
loading

Tabla de contenido