Installing Your Freezer; Unpacking Your Freezer; Adjusting Your Freezer; Proper Air Circulation - Haier LW145AW Manual Del Usuario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

English

insTalling your freezer

Unpacking Your Freezer

1. Remove all packaging material. This includes the foam base
and all adhesive tape holding the freezer accessories inside
and outside.
2. Inspect and remove any remains of packing, tape or printed
materials before powering on the freezer.

Adjusting Your Freezer

• Your freezer is designed for freestanding installation only.
It should not be recessed or built in.
• Place the freezer on a floor strong enough to support it fully loaded.
• When moving the freezer, never tilt it more than a 45-degree angle.
This could damage the compressor and the sealed system.
• If the freezer is tilted let it stand in an upright position for at least 24
hours prior to plugging it in. This is to allow the refrigerant to settle.

Proper Air Circulation

• To ensure that your freezer works at the maximum efficiency it
was designed for, you should install it in a location where there
is proper air circulation, plumbing and electrical connections.
• The following are recommended clearances around the freezer:
Sides...............4" (102mm)
Top....................4" (102mm)
Back..................4" (102mm)
5
Tabla de contenido
loading

Tabla de contenido