Oase BioSmart Serie Instrucciones De Uso página 4

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

- English -
Installation
1. Lay the outlet pipe for the water outlet into the pond and
the hose for the sludge drain into the sewage system or
2.
level ground.
carry out work on the unit.
3. To avoid pressure loss, use hose connections which are as
avoid bends and lay well protected.
corresponding mark.
Push or turn the hose for the water inlet onto the open stepped
hose nozzle and secure with a hose clip.
nozzle, push the thread of the stepped hose nozzle through the
water inlet, insert an O ring on the thread from inside, screw the
inlet nozzle on the stepped hose nozzle from inside ensuring that
the opening points downward.
Lay the hose so that it cannot be stepped on, avoid kinks and
connect it to the pump.
using the cover cap.
cover cap from the dirt drain, push the union nut over the 2" hoze
nozzle, push on the hose and secure with the hose clip, insert
2" hose nozzle including the union nut on the dirt drain.
garden hose to the fresh water connection and to connect the
OASE pond aerator AQUAOXY 400 to the air connection to
1.
2.
3.
4
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Biosmart 5000Biosmart 10000

Tabla de contenido