i
All the electrical ope-
rations must be carri-
ed out BY QUALIFIED
PERSONNEL, IN AC-
CORDANCE WITH THE
CORRESPONDING RE-
GULATIONS,
trained
and informed about
the risks related to
such operations.
The unit is fully wired in the factory and,
for the start-up, requires a power sup-
ply as shown in the indications on the
unit's rating plate, with online protecti-
ve cut-outs.
The cable cross sections and the di-
mensioning of the line main switch are
purely indicative.
The installer will be responsible for
properly scaling the power line with re-
gards to the length and type of cable,
the input power of the unit and the phy-
sical positioning.
All the electrical wiring must comply
22. 1
ELECTRICAL DATA
Number
WSA/WSB
power sup-
plies
0701
1
0801
1
0901
1
1101
1
1402
1
1602
1
1802
1
2002
1
2202
1
2502
1
2802
1
32
ELECTRICAL WIRING
22
The
characteristics
i
electric lines and related
components must be esta-
blished by PERSONNEL
AUTHORISED TO DESIGN
ELECTRIC INSTALLATIONS,
following international re-
gulations and the national
regulations of the country
in which the unit is installed
in compliance with the legi-
slative regulations in force
at the moment of installa-
tion.
with the regulations in force at the time
of the installation.
The data given in this documentation
must only be used as an aid for setting
up the electric lines. For installation re-
quirements, the wiring layout supplied
with the unit must be compulsory re-
ferred to.
Note:
Check that all power cables are cor-
rectly secured to the terminals when
switched on for the first time and after
30 days of use. Afterwards, check the
Sect. A
Versions
mm 2
(no. conductors - sect.) for each phase
recovery hole
70
recovery hole
70
recovery hole
95
recovery hole
120
recovery hole
185
recovery hole
240
recovery hole
240
standard
2x150
recovery hole
2x150
recovery hole
2x185
recovery hole
2x185
of
For installation requi-
i
rements, the wiring
layout supplied with
the unit must be com-
pulsory referred to.
The wiring layout toge-
ther with the manuals
must be kept in good
conditions and readily
ACCESSIBLE FOR FU-
TURE OPERATIONS ON
THE UNIT.
Sect. B
Earth
mm 2
mm 2
1.5
35
200
1.5
35
200
1.5
50
200
1.5
70
250
1.5
95
315
1.5
120
400
1.5
120
630
1.5
150
630
1.5
185
630
1.5
185
630
1.5
185
630
It is compulsory to
i
check
the
sealing
before
necting the electrical
wiring. The machine
should only be powe-
red once the hydraulic
and electric operations
are completed.
connection of the power cables every
six months.
Slack terminals could cause the cables
and components to overheat.
Cross sections recommended for the
maximum length of 50 m. The cable
cross sections and the dimensioning
of the line main switch are purely indi-
cative.
IL
A
KEY
Sect. A
Power supply
Earth
Earth to bring to the
machine
IL
Main switch
machine
con-