Flushing On A New System - Rothenberger ROPULS Instrucciones De Uso

Ocultar thumbs Ver también para ROPULS:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

4.2

Flushing on a new system

(to DIN 1988, part 2, paragraph 11.2 – see 2.
Application)
-
program selection 'Flushing Water + Air'
If at all possible, the installation should be
flushed after pressure testing. Client or
planner should be present for the flushing.
1. Push program key 'flushing water + air'.
Flow rate is indicated when stop valves are opened, and air blasts at proportionate rate are
delivered into the pipe system.
2. Conversion Table – Min. Flow Rates
Max. nominal diameter of
distribution pipe DN (copper
pipe)
Min. flow rate m
Max. nominal diameter of
distribution pipe DN
(galvanized steel pipe)
Min. flow rate m
If a min. flow rate of 0,5 m/sec is not reached, flush by means of storage tank and pump.
3. Wiring diagram - pressure increase
4. Flushing per outlet must take at least 15 sec per running meter of pipe to be flushed or 2
minutes per tap.
5. Flushing must proceed from the bottom to the top.
15x1
3
/h
0,20
½"
3
/h
0,36
ENGLISH
18x1
22x1
28x1
0,32
0,46
0,68
¾"
1"
1 ¼"
0,66
1,05
4,52
Cleaning Compressor
35x1,5
42x2
54x2
1,27
1,84
1 ½"
2"
2,63
3,71
23
Tabla de contenido
loading

Este manual también es adecuado para:

6.01006.0101

Tabla de contenido