Authorized Personnel Maintenance Solution Pump Removal - Clarke Clean Track 16 Instrucciones De Uso

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

A-12 / ENGLISH
AUTHORIZED PERSONNEL MAINTENANCE
SOLUTION PUMP REMOVAL
1
Drain the recovery and solution tanks and tip the machine over onto its side.
2
See Figure 8. Remove the (2) (A) Screws and disconnect both bottom solution hoses (B) from the Solution Pump.
3
Tip the machine back upright, grab hold of the Operator's Handle (1) and push down to tilt the entire recovery / solution tank assembly back.
FIGURE 8
4
Disconnect the top solution hose and the pump wiring connectors. The Pump (C) can now be lifted straight up and out of the base assembly.
NOTE: Make note of the orientation of the pump mounts (D) for reassembly. Make note of the connection locations of the wiring for
reassembly.
5
Follow the above steps in reverse order to install the pump.
A-12 - FORM NO. 56041660 - Clean Track
EN
BOTTOM VIEW OF MACHINE
16, 18
®
revised 10/07
Tabla de contenido
loading

Este manual también es adecuado para:

Clean track 18Clean track 18 wash&rinse56266000562660015626600256266132 ... Mostrar todo

Tabla de contenido