Indoor Unit Installation
2.
(For existing ceilings)
Refer to the
template for ceiling opening dimensions.
Create the ceiling opening required for installation. From the side of the opening to the casing outlet, implement the
refrigerant and drain piping and wiring for remote controller (unnecessary for wireless type) and wiring between units.
Refer to each Drain piping work or Wiring section.
After making an opening in the ceiling, it may be necessary to reinforce ceiling beams to keep the ceiling level and to
prevent it from vibrating. Consult the builder for details.
3.
(Use either a M8-M10 size bolt or the equivalent)
Use a hole-in anchor for existing ceilings, and a sunken
ceilings to reinforce the ceiling to bear the weight of the unit.
Adjust clearance (2-4 inch (50-100mm)) from the ceiling
before proceeding further.
4.
Installing the indoor unit
Daikin.
1) Install the indoor unit temporarily.
Attach the hanger bracket to the suspension bolt. Be sure
upper and lower sides of the hanger bracket.
2) Refer to the
template for ceiling opening dimension.
Consult the builder or carpenter for details.
The center of the ceiling opening is indicated on the
template. This indication also indicates the center of the
unit.
The
template can be rotated by 90° to be able to
indicate the correct dimensions on all 4 sides.
After cutting the template from the packaging, attach the
template to the unit with F screws (×4) as shown in
Ceiling height is shown on the side of the
Adjust the height of the unit according to this indication.
3) Adjust the unit to the right position for installation.
(Refer to
7
C washer from the
F
Screws
template.
Installation Example
Anchor
Long nut or turn-buckle
Suspension bolt
False ceiling
Securing the hanger bracket
Nut
Hanger bracket
C
Double nut
Installation of template
.)
Ceiling slab
unit:inch (mm)
E
Template
F
Screws
Center of the ceiling opening