8.1.2 Lift assembly with riser extension
Extension
1. Riser extension is set on the existing riser. The open
side faces inwards.
2. Set to the desired height (from 100 mm to 900
mm in 100 mm steps) depending on the ceiling
height. Guide the 4 hydraulic lines (fastened to
the operating column) upwards out of the riser.
3. Fasten the cover.
4. After setting up the lifting columns, lift the cross-
connection fastened to the operating column
upwards and fasten to the opposite side. The
hydraulic lines are placed in the cross-connec-
tion.
94
5. Guide the lines from above into the riser of the
opposite side and connect to the colour marked
positions.
6. Fasten the extension using the long screws after
the tensioning plate (A) has been placed.
Extension
A
8.1.3 Retrofitting the riser extension
Extension
1. The optional riser extensions are delivered in a
box. Have other supplied parts at hand: Hoses,
covers, plates, extensions, press panels, screws.
2. Riser extension is set on the existing riser. The open
side faces inwards.
OPI-POWER LIFT HF 3S 3000-4000 - HYMAX HF 3S 3000-4000 -V1.1-DE-EN-FR-ES-IT
Extension