Step 3 - Level The Beverage Center; Step 4 - Complete Installation - Haier HEBF100BXS Manual Del Usuario

Centro de la bebida
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS
STEP 3 - LEVEL BEVERAGE CENTER
Your beverage center has two leveling legs located in the front, bottom
corners. After placing the beverage center in its final position, level the
beverage center.
NOTE: The beverage center door will close easier when leveling legs are
extended.
Adjust the Leveling Legs:
To Raise – Turn the leveling legs to the left.
To Lower – Turn the leveling legs to the right.
Raise

STEP 4 - COMPLETE INSTALLATION

Plug into a grounded 3 prong outlet.
Do not remove the ground prong from the power cord plug.
Do not use an adapter.
Do not use an extension cord.
Failure to do so can result in death, fire or electrical shock.
Plug into a grounded 3 prong outlet.
49-60809 Rev. 2
WARNING
ELECTRICAL SHOCK HAZARD
Lower
13
Tabla de contenido

Solución de problemas

loading

Tabla de contenido