Step 1 - Haier 2U20EH2VHA Instrucciones De Instalación

Ocultar thumbs Ver también para 2U20EH2VHA:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS
Outdoor Unit Clearances
NOTE: If there is danger that the unit will fall or turn over,
fix the unit by inserting bolts, wire or other foundation
options.
NOTE: Place the unit on a level mounting base (or a plastic
pedestal) for proper drainage.
(3) Installation and maintenance space
Selection of installation location of outdoor
8
Select the Outdoor location:
• Choose a level place solid enough to bear the weight and
vibration of the OD unit and where the operation noise will
not be amplified.
• Choose a location where the hot air discharge and/or noise
will not create a nuisance for neighbors.
• Ensure there is sufficient space to maneuver the OD unit
into place.
• Ensure there is sufficient space and no obstructions for the
air inlet and outlet.
31-5000001 Rev. 6
Step 1 - Preparation
NOTE: Install the outdoor unit in a level position. Failure
to do so may result in water leakage or accumulation.
• I nstall the unit's power/communication wiring at least
10 feet away from television and radio sets to prevent
interference.
• Ensure any moisture sensitive items are kept away from the
condensate drain path of the OD unit.
• Choose a location not affected by heavy snowfall or wind.
• To prevent wind exposure, install a wind baffle.
9
Tabla de contenido
loading

Tabla de contenido