6. Installation
Important:
Always wear safety glasses while installing lift.
Required Tools and Supplies List
1. 208-230V, 60 Hz, 30 amp service
2. 208-230V, 50 Hz, 30 amp service
3. 460V, 60 Hz, 10 amp service
4. 15 liters of ATF Dexron III or hydraulic fluid that
meets ISO 32 specifications
5. Chalk line
6. Tape measure, 15 ft (4.5 m) min.
7. Level, 6 ft (2 m) min.
8. Open end wrenches
9. Needle nose pliers
10. Cross head screw driver
11. Oil funnel
12. Hammer drill with 1/2" bit
7. Surface Mount & Flush Mount Control Cabinet Layout
Layout the service bay according to the architect's
plans or owners instructions. Failure to install in
this orientation can result in personal and property
damage. Be certain that the proper conditions exists,
see previous page.
Note: The correct orientation of the platforms is critical
for proper layout of the lift.
Place the control cabinet in the approximate location
(do not anchor), Fig. 3. Relocating the control cabinet
further away than the standard distance will require
the installer to provide suitable hydraulic hoses.
Additional hose covers will also be needed if installing
the control cabinet at a further distance than the
standard distances in surface mount configurations.
Hydraulic hoses should be 1/4" (6mm) min. ID with
a min. working pressure of 4000 psi (27579 kPa) with
#6 JIC Swivel Female fittings. Extension Hose Kits
available.
8. Flush Mount Pit Requirements
Prior to pouring concrete, installer will need the Full
Flush Mount Kit (part # XX100003). Please contact the
phone number listed on the front cover of the manual
for additional assistance. The Full Flush Mount Kit
contains frame components with concrete ties that
will need to be placed during concrete pour. See parts
breakdown manual for included components. Pit forms
are not provided and will be the responsibility of the
installer.
Bend frame anchors outward, perpendicular to angle
frame, and downward approximately 45° to floor level,
Fig. 1a.
Place the recess box in the pit and install M8 bolts
to secure to frame and anchors to pit floor. If recess
weldment is not used, fasten recess box using anchors
only, Fig. 1b.
For flush mount pit specifications, Fig. 2.
27-1/8"
(689mm)
5
Fig. 1a