VSG LP20632 Instrucciones De Instalación página 19

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

13. Final Positioning of Platforms
1. Verify the platform bases are square and the
distance between the platforms is correct.
2. Verify platform bases are level, Fig. 9.
3. Verify platform bases are level to each other, Fig. 9a.
4. Verify both platform bases are level front to rear, Fig.
9b.
5. Verify platforms are level, Fig. 9c.
6. Verify platforms are level to each other, Fig. 9d.
19
Fig. 9
Fig. 9a
Fig. 9b
Tabla de contenido
loading

Tabla de contenido