Fronius Symo Advanced 10.0-3 208-240 Manual De Instrucciones página 30

Inversores para instalaciones fotovoltaicas acopladas a la red
Ocultar thumbs Ver también para Symo Advanced 10.0-3 208-240:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Maximum solar voltage (V)
maximum solar module voltage measured during the observation period.
After pressing the Enter key
the voltage values for MPP Tracker 1 and MPP Tracker
2 (MPPT1/MPPT2) are displayed, if MPP Tracker 2 is activated (see 'The Basic menu' -
'The Basic menu entries')
Operating Hours
indicates how long the inverter has been operating (HH:MM).
IMPORTANT! The time must be set correctly for day and year values to be displayed
properly.
30
Tabla de contenido
loading

Tabla de contenido