Orbis VIARIS CITY Manual De Uso página 52

Ocultar thumbs Ver también para VIARIS CITY:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

SMART CHARGING STATION INSTALLATION
• The minimum installation height for sockets and connectors
shall be 0.6 m above ground level. If the charging station is
designed for public use, the maximum height shall be 1.2 m, or
between 0.7 m and 1.2 m in places intended for persons with
reduced mobility (consult the particular instructions for the
country where the equipment is being installed in case other
heights are specified).
• The station must be installed vertically and kept clear of
obstructions to allow for maintenance.
• Use joints or stuffing boxes to ensure the station's IP rating.
• The station should be installed by two people.
Assembly with stand
corrugated tube
shank fastening
template
B30 concrete density:
350 kg of cement / m
3
8
Ø63
corrugated tube
stainless steel M16
threaded rods
Tabla de contenido
loading

Tabla de contenido