Nordcap Oscartielle GENIUS 2 Instrucciones De Uso página 18

Idiomas disponibles
  • ES

Idiomas disponibles

-
Check that the unit evaporator is not covered with ice; otherwise, see point 11.
-
Check that the unit isn't close to strong air flows or heat sources (see point 4).
-
Check that the unit is levelled and that the environmental conditions meet those indicated in point 4.
If the problem persists despite the above checks, contact your nearest service centre.
Warning: Never approach the motor compartment in the event of leaking gas or a fire. Unplug at the mains. Never use
water to put out any flames, but only dry powder extinguishers. All the materials used to build the unit are fire-proof or
self-extinguishing and non-flammable.
13 – Accessories
The GENIUS 2 - EAGLE displays can be fitted with the following accessories on request.
-
Night cover.
-
Row dividers.
-
Raised plexiglas edges for display shelves.
-
Shelf illumination.
-
Electric defrosting (armoured resistances on the evaporator).
If interested in purchasing any of the above accessories, contact your nearest Oscartielle dealer or Oscartielle S.p.A
directly. Only Oscartielle Customer Service is allowed to fit the defrosting resistances.
14 - Customer service
If you need the assistance of a technician or mechanical, electrical or compressor components need to be replaced,
please contact the dealer from whom you bought the unit and ask for original spare parts.
15 - Dismantling and elimination of cabinet
For environmental reasons and in compliance with the regulations in your country, separate the parts of the cabinet for
disposal and/or recycling.
All the parts that make up the cabinet are made of materials that are not classifiable as urban waste except for the
metallic parts that are not classified as special waste in most countries. As regards the parts of the refrigeration circuit,
that is the refrigerating gas and lubricating oil, these should not be disposed of carelessly and can be recycled by
specialized centers.
This product contains HFC, namely fluoridated gasses, a refrigerating gas with a high Global Warming Potential
(GWP) regulated by the Kyoto protocol.
The gas contained in foam polystyrene for thermal insulation of the cabinet is (R134A).
Oscartielle equips its plug-in cabinets with the following types of refrigerating gasses:
= 1300
R 134a; GWP
(100)
R 404A; GWP
) = 3750
(100
This unit is hermetically sealed and the refrigerating gas load is under 3 kg.
For this reason it is not subject to the requisite of an installation booklet and periodic inspections for leakage of
the refrigerating gas (presidential Decree no. 147 of February 15th 2006, Art. 3 and 4).
16 - Manufacturer's statement (Start-up prohibition)
The above models are also built to be assembled in-line with other items of machinery to produce a machine, as defined
by EEC Directive 89/392.
Therefore, the Manufacturer hereby states that it is not permitted to start the unit up until the machine in which it is
incorporated or will become a part of has been identified and its compliance with the provisions of EEC Directive 89/392
and applicable national laws has been stated. In other words, until the machine referred to in this statement becomes one
with the final machine.
17 – Multiplexing instruction
Multiplexing instruction Genius 2 - Eagle line-up (FIG. 14 page 5)
-
The side adjusting profiles (Ref.H-I) and the holders for the top canopy (Ref.L) are already assembled.
-
Remove the top canopies, the front decoration trim and the bottom plinth.
-
Insert the proper pins (Ref.G) in the bumper rail.
-
Align the cabinets and level them by adjusting the feet.
-
Join the cabinets using the fitting screws and die-cast brackets (Ref.A-B).
-
Join the basements using the proper threaded bars (Ref.E-F).
-
Join the top part of the cabinets (Ref.C-D).
-
Assemble the top canopies.
-
Insert the part at Ref.M inside the top canopies in order to hold them aligned.
Multiplexing instruction island Genius 2 - Eagle standard (FIG. 15 page 6)
-
Align the cabinets and level them by adjusting the feet.
-
Join the wall cabinet and align the front basin of the multideck in line-up to the header.
-
Join the ceiling using the proper screw (Rif. A).
-
Join the basin of the cabinet to the one of the header, using the proper screws (Rif.B).
-
Assemble the top canopies and the bottom plinth.
20
loading