Main Body Valve Installation(Model:A&B)
Step1
anchors
(Concrete wall)
1.Make marks according to the size of the main body valve, and then drill anchors into
the wall (concrete wall).
2.Lock the main body to wood directly with screws (wood wall).
3.When installing the main body, please mark the UP side up and do not install it
upside down.
▲ Please note that the level meter should be parallel to the wall; otherwise, the deck
plate cannot be installed.
Main Body Water Outlet Switch Control(Model:A&B)
Close
1.Open the water valve and check for any leakage
2.Turn the handle upwards to open the water valve. The turning angle can control the water
outflow rate. Then, the user can turn it to the left or right to control the water tem
perature, where the left is for hot water and the right is for cold water.
3.The switch valve can alternate the water outlet between the shower head, body jet,
and handheld shower
(wood wall)
Handheld
Water Outlet
Open
Rainfall
Water Outlet
Hot water
9
Cold water