Pulsar M
2.2
Installation in Tower Position
2.3
Installation in Rack Position
It is advised to first install the battery module, then the power module above.
Follow steps 1 to 4 for module mounting on the rails.
The rails and necessary hardware are supplied, except for 3U models, by MGE Office Protection Systems.
2 — 2
Installation
E E N N G G L L I I S S H H
86-86710-00 A01