Sunjoy L-GZ120PST-9 Instrucciones De Montaje página 11

Gazebo de ventana panoramica
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Step 1:Bottom Frame Set-up
C1
C2
B1
C2
B2
B1
A
C1
B2
Fig.1
A
Fig. 1-1 & Fig. 1-2, Screens setup:
Insert the Left Screen (B1) into the Big Screen (A), pull it down
to fix them(Fig.1-2); then use Screw (AA), Washer(CC) to secure
Left Screen(B1) and Big Screen(A); Do the same for Right(B2) and
Big Screen(A)as( Fig.1-1). Don't tighten the screws completely at
this time.
Fig. 1-3, Frame setup:
Connect the Long Bar(C1) and the assembled screens with
Screw(BB) and Washer (CC); Do the same for Short Bars (C2)
and the Screens, until you get the complete frame set up as
shown in Fig.1.Don't tighten any of the screws completely at this
time.
Tabla de contenido
loading

Tabla de contenido