TECE SH-RC 77420072 Guía De Usuario página 27

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 63
GB
2. FIRST INSTALLATION
2.1 Thermostatic head installa-
tion on the radiator valve
You need first to select a brass adaptor nut
compatible with your TRV.
The SH-RC must be installed with the axis
in opened position, so you can install it
directly on the radiator valve before power
on the product (See steps drawings on
the right)
Nota: If the valve is closed, it may block
the operation of installation on the radiator.
In that case, you need to power on the
product (remove the strip of the batteries)
then follow this procedure:
• Go in the Parameters Menu number 10
by pressing and maintain the (
more than 5 seconds, and we will see
the following screen:
• Press the (
) key to validate. You will
see OPEN. Wait the backlight extinction,
the motor will perform the completely
open move
Axis in opened
position for installation
) key for
Axis in closed
position
You can then install the product on the
radiator valve.
Push the (
to finish (Clos)
) key
27
loading

Productos relacionados para TECE SH-RC 77420072