Berner AEROMAT 2 Instrucciones De Manejo página 4

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 20
APPLIES TO ALL MAINTENANCE OR REPAIR WORK:
• It is essential to disconnect the Aeromat from the compressed air
connection before carrying out maintenance or repair work.
• Only use original spare parts.
• The maximum working pressure must not be exceeded
(see point 1 "Technical data").
If necessary, the working pressure must be set via a pressure reducer.
• Use only compressed air as the energy source.
• When working on and with the Aeromat, wear the required work
gloves, protective goggles, if necessary, protective clothing.
• If leaks occur in the unit or other operating faults, the unit must be disconnected
from the compressed air supply immediately and the cause of the fault rectified.
• Take care with flammable media.
• Open fire, lighting sparks or smoking is prohibited.
• Processed media and cleaning agents must be disposed of in an
environmentally friendly manner.
• The disposal of the unit must be carried out in accordance with the applicable
legal regulations.
6. COMMISSIONING / END OF WORK
Check the Aeromat for completeness and/or damage.
COMMISSIONING:
Attach the transparent suction hose to the connection provided on the Aeromat.
spanner to tighten the union nut lightly. Guide
then insert the weight at the end of the suction line from the canister or barrel connection into your product
container and screw the cap hand-tight. Information: In order to be able to set up the Aeromat and the
product container flexibly, the transparent suction hose is supplied with a length of approx. 3m. This
length may be shortened as desired before connecting it to the product container. Once the final location
of the Aeromat and the product container has been selected, you can now also screw the suction hose to
the product container. This is also done easily with the help of an open-ended spanner. Using an open-
ended spanner or ring spanner, turn the compressed air connection in such a way that into the ¼" thread
that seals the connection. If necessary, secure the threaded connection with a second open-ended
spanner so that it does not overtighten. You can then connect the system to your compressed air
network. To avoid static charge, an earthing cable can be connected as an option. If everything is
connected properly, the initial filling of the Aeromat starts automatically with the connection of the
compressed air. Please note that after the initial connection of the Aeromat, the target filling quantity of
the spray bottle (370-400 ml) is lower due to the design.
Attention:
When working with chemical media, be sure to wear gloves, protective goggles
and, if necessary, protective clothing.
3
EN
Use an open-ended
loading

Este manual también es adecuado para:

208989