(6). Adjust the height of the unit to make the drain pipe slant slightly downward so that the
drainage will become much smoother.
4.1.4 Leveling
The water level test must be done after installing the indoor unit to make the unit is horizontal,
as shown below.
4.2 Installation of the Outdoor Unit
① . Install the unit where it will not be tilted by more than 5°.
② . During installation, if the outdoor unit has to be exposed to strong wind, it must be fixed securely.
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
DC Inverter U-match Series Floor Ceiling Type Unit