Water2Buy W2B 110 Manual De Instrucciones página 6

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 173
connection (v) on the control valve.
If the unit is located where the drain line must be elevated. You may
elevate the line up to 1.8 metres providing the tubing length does
not exceed 4.5 metres and water pressure at softener is not less
than 1.bar (14 psi). You may elevate an additional 60cm for each
additional .7bar of water pressure.
Where the drain line is elevated but empties into a drain below the
level of the control valve, form a 20cm loop at the end of the tubing
so that the bottom of the loop is level with the drain line connection.
This will provide an adequate siphon trap.
Where the drain empties into an overhead sewer line, a sink trap
must be used.
Installing your water softener unit
Check parts included: unpack the box and remove the water
softener unit. The unit includes the parts listed below:
Water softener
Cover
Power supply transformer
Packet of Silicon lube
In/Out plumbing connections
Install guide
Bypass valve adjustment tool (meter models only)
Plumbing fittings
Tools and Materials needed
Adjustable wrench
Standard pliers, and larger adjustable jaw pliers or pipe
wrench to fit sink drain slotted
Phillips head screwdrivers
Pipe joint compound (thread seal) or Teflon tape, approved
for use on potable water supplies
Hand or battery powered drill
loading

Este manual también es adecuado para:

W2b 300W2b 700