Mounting The Switch; Grounding The Switch - Eaton TRIPP LITE Serie Guia De Inicio Rapido

Switch gigabit ethernet industrial administrado
Ocultar thumbs Ver también para TRIPP LITE Serie:
Tabla de contenido
Installation
Instalación / Installation /
Installation / Installazione

Mounting the Switch

Instalación del Switch
Montage du commutateur Démontage du commutateur
Montage des Switches
Montare l'interruttore
ATTENTION: This switch is an open-type device and shall be DIN-rail mounted or wall
mounted (optional) in a cabinet or enclosure.
Mounting the Switch
Place the switch on the DIN rail from above using the slot, then push the front of the switch
toward the mounting surface until it snaps into place with a click sound.
Dismounting the Switch
Press the switch from top and pull out the lower edge of the switch, then remove the switch
from the DIN rail.

Grounding the Switch

Before powering on the switch, ground the switch to earth. Ensure the rack on which the
switch is to be mounted is properly grounded and incompliance with ETSI ETS 300 253. Verify
there is a good electrical connection to the grounding point on the rack (no paint or isolating
surface treatment).
ATTENTION: This switch is intended to be mounted to a well-grounded mounting surface
such as a metal panel.
CAUTION: The earth connection must not be removed unless all power supply connection
has been disconnected.
2
Removing the Switch
Retiro del Switch
Ausbau des Switches
Smontare l'interruttore
Tabla de contenido
loading

Este manual también es adecuado para:

Tripp lite ngi-m04c2Tripp lite ngi-m05-c1Tripp lite ngi-m08c2Tripp lite ngi-m08c4-l2Tripp lite ngi-m08c4poe8-2Tripp lite ngi-m08poe8-l2 ... Mostrar todo

Tabla de contenido