Extend network
III
1. Place the other devices in the kit within 3
meters from the primary node to power
them on. Wait for about 3 minutes. When
the LED indicators of these devices light
solid green, the networking is successful
and these devices become secondary
nodes in the network.
LED indicator
2. Please refer to the following relocation tips
to locate the secondary nodes to a proper
position:
• Ensure that the distance between any two
nodes is less than 10 meters.
• Keep your nodes away from electronics
with strong interference, such as
microwave ovens, induction cookers, and
refrigerators.
• Place the nodes in a high position with
few obstacles.
3. Power on the secondary nodes again till these
LED indicators blink green slowly.
The MX15 Pro(3-pack) is taken as an example
here.
Tips
If the LED indicator of secondary node keeps
blinking green slowly for more than 3 minutes,
relocate the secondary node and move it closer to
the primary node.
05