Julabo Peltier TE400 Manual Del Operacion página 88

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 119
Installation Procedure
Requirements
 Unit prepared for maintenance. Refer to Preparing the Unit for Maintenance.
 Power connected to unit.
 Coolant hoses connected to the unit (Make sure the hoses are corrected to
Required Tools and Materials
 Filling funnel
 Measuring cup
 Absorbent cloth
Procedure
1. Remove the Fill Cap.
2. For information regarding coolant to be used and quantity, refer to
3. Add coolant up to required level. Ideal coolant level is just below the
4. Press the 'PUMP' button on the LCD panel to fill the coolant lines to the
5. When the tank level starts reducing, continue adding coolant through the
6. Note: Do not let the pump run dry as it can be damaged.
7. Mount the coolant cap again.
 The coolant is now added.
88
the correct ports).
Specifications. Use a filling funnel to avoid moistening any current-
carrying components with coolant. Note: If refilling coolant, go to last
step.
'HIGH' marking on the front view port of the tank.
application.
fill port, until the ideal coolant level is reached with the pump
continuously running.
loading

Este manual también es adecuado para:

9635400