Tools And Materials Required; Remove The Packaging - Monogram Z2V830 Instrucciones De Instalación

Campana de ventilacion de chimenea de 30' (76,2 cm)
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation Preparation
TOOLS AND MATERIALS REQUIRED
Ee
(NOT SUPPLIED)
ee
Oo Tape measure
—<2
ee
Gloves
Oo Knife
..
CO Spirit level
Spirit level
O Wire cutter/strioper
Measuring tape
HO Wire nuts
O Electric drill with 1/8" and 3/8" bits
——
0 Phillips and flat blade screwdrivers
\
YS
aN
CO Hammer
,
(i
Ga
iN
A Phers
Pliers
Electric drill
YY
t) with 1/8" and
Wire
0 Safety glasses
DO Aluminized duct tape
FH Tape to mount template
FO Gloves to protect against sharp edges
Aluminized
—,)
FH 120V 60Hz. 15 or 20 Amp, 2 wire with
duct tape
ey
ground Properly grounded branch circuit
OD Strain relief for junction cover
S
Hammer
0 8" round metal duct, length to suit
O5
=
installation
;
"
ar
0 Saw, jig saw or reciprocating saw
Strain relief
Prilh
HO Tin snips
__
=
head"
Flat blade
a2 ()=0
;
screwdriver
screwdriver
Wire nuts
eh
Saw, jig saw or
Masking tape
reciprocating
8" round metal duct,
oo
saw
length to suit
Tin snips
installation
REMOVE THE PACKAGING
CAUTION:
wear gloves to protect against
sharp edges.
¢ Remove
duct covers.
« Remove the parts box and other pieces. Locate
the literature package.
« Remove and properly discard the protective plastic
wrapping and other packaging materials.
Tabla de contenido
loading

Tabla de contenido