STRUCTURE
2.2. REFRIGERANT CyCLE
2.2.1. CH UNIT - CH-(6.0/10.0)N1
To Indoor Unit
High Pressure Gas
Low Pressure Gas
2.3. NECESSARy TOOLS AND INSTRUmENT LIST FOR INSTALLATION
No.
1
Handsaw
2
Phillips Screwdriver
3
Vacuum Pump
4
Refrigerant Gas Hose
5
Megohmmeter
6
Copper Pipe Bender
7
Manual Water Pump
8
Pipe Cutter
9
Brazing Kit
10
Hexagon Wrench
Electric Expansion Valve
MVD1
MVD1
Strainer
S
Tool
Strainer
Electric Expansion Valve
MVD2
Capillary Tube
Electric Expansion Valve
MVS2
Electric Expansion Valve
Strainer
MVS1
: Refrigerant Flow Direction
: Refrigerant Flow Direction
No.
11
Spanner
12
Charging Cylinder
13
Gauge Manifold
14
Cutter for Wires
15
Gas Leak Detector
16
Leveller
17
Clamper for Solderless Terminals
18
Hoist (for Indoor Unit)
19
Ammeter
20
Voltage Meter
To Outdoor Unit
High Pressure Gas
S
Low Pressure Gas
S
Low Pressure Gas
(Cooling Operation)
(Heating Operation)
Tool
PMML0204 rev.0-05/2010
10