Daikin Tewis HFC Manual De Seguridad página 30

Idiomas disponibles

Idiomas disponibles

HFC user manual
CAUTION
To avoid cuts on your hands, wear protective gloves.
CAUTION
Remove the power before handling the equipment.
Scheduled operations to be carried out during the life of the refrigeration unit.
TASKS TO DO
Oil level
Humidity level
Refrigerant level
Detection of possible leaks
Check tightening of connections and electrical terminals
Check tightening of nuts and flexible joints
Check tightening of removable connections with
joints (sight glasses, filters, buoys, etc.)
Check operating temperatures and pressures
Check safety valves and control elements
Oil change of the installation
13.1 Technical setbacks
The setbacks that may occur during the operation of the equipment can be:
1. In case of imperfect system operation, check the refrigerant using the liquid flow indicator
located in any system with thermostatic valve. This control must be carried out with the
equipment in operation and with a temperature in the chamber similar to the desired one.
Normally the indicator appears clean while in case gas is missing the persistent presence of
gaseous bubbles will be observed.
2. If the compressor or fans stop, check that :
• The protection fuses of the main circuit and auxiliary circuit have not been blown. In this
case, change them after checking that the supply voltage is correct and that the polarity
of the phases is respected.
• If the compressor group is blocked (the pilot light on the panel lights up), manually rein-
sert the thermal relay, after ascertaining the causes.
• If the motor-fan is blocked, it will automatically reset, but you must find the cause. The
thermal protections of the compressor and the fans are in the electrical panel. To reset it,
you must turn off the main switch.
30
FREQUENCY
1500 hours
Weekly
(3 months approx.)
CHECK
CHECK
CHECK
CHECK
CHECK
CHECK
CHECK
Between 10 000 and 12 000 hours of operation
6000 hours
3000 hours
(1 year approx.)
(6 months approx.)
CHECK
CHECK
loading