Uline H-5644 Manual página 3

Ocultar thumbs Ver también para H-5644:
Idiomas disponibles

Idiomas disponibles

CEILING MOUNTING
1.
Pick the approximate location for the reel within
2⁄' of a 110-125V standard ground outlet.
2. Locate a joist or beam to install the mounting
bracket. The bracket should be placed directly over
the center of the joist or beam.
3. Using the bracket as a template, mark the screw
locations with pencil. (See Figure 5)
Figure 5
2⁄"
Bracket Hole Pattern
4. Pre-drill (pilot holes) the three screw holes with the
use of a 1/4" drill. The depth of the pilot holes should
be at least 2".
5. Install the bracket with the three provided hex head
wood screws with washers using a 1/2" wrench or
socket. Tighten all three until snug. (See Figure 6)
Figure 6
Bracket
6. The reel can now be installed into the bracket.
PAGE 3 OF 12
INSTALLATION CONTINUED
2⁄"
Hex Head
Wood Screws
7.
Slide the mounting pin through bracket and reel.
(See Figure 7)
WARNING! Slide the locking pin through the
mounting pin for security. It will prevent the
mounting pin from sliding out of position.
Figure 7
Locking
Pin
NOTE: When ceiling mounting is against a steel
beam, use at minimum 1/4" bolts with lock
washers or locking nuts.
WARNING! DO NOT USE solvents such as
gasoline, turpentine, etc. to clean unit. Keep
reel cord clean to assure smoothest automatic
retraction. To clean, simply pull cord to its
full length and allow to retract through a
dampened rag. Pull out full length again and
allow to retract through clean rag sprinkled
with talcum powder. DRY THOROUGHLY BEFORE
PLUGGING BACK INTO OUTLET.
Ceiling
Mounting
Pin
0623 IH-5644
loading