Electrical connection
Attention
Here, the general as well as the local regulations must be observed.
Therefore, this step should only be carried out by a trained specialist. Pay attention to the
necessary supply line (see
Check before first lifting
Check all connections (screws, nuts, bolts, etc.) for correct fastening.
Check all limit switches for correct setting and function.
Check all components and connections of the hydraulics and pneumatics for tightness and tighten if
necessary.
Check all pushbuttons for correct function. Make sure that all components required for the function are
activated (open detents, open lowering valve, activate motor contactors, etc.).
Observe the direction of rotation of the motor and change it if necessary.
Raise and lower the lift 2 to 3 times, checking the synchronization.
Tip
To check the synchronization, you can measure the distance of the lift truck to the base
plate. The lift carriage that is further down must be tightened.
Lifting under load
Lift a load to a height of approx. 1000 mm.
Then lower the load to the first notch (approx. 500 mm).
Check the synchronization and adjust it if necessary.
When continuing to lift, continue to pay attention to the synchronization.
Lower the load and install the missing covers or ramps.
Note
After installation, fill in the attached
This information will be needed in case of a possible service case.
Emergency lowering in case of power failure
1. Switch off the stage via the main switch and secure it against being switched on again.
2. To unlock the safety catches, lift both lifting carriages approx. 30 mm using a suitable lifting device.
3. Unlock and secure the safety catches manually so that the lift trucks can lower.
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
104
"Electrical
Release date: 18.08.2023 / Product manufacturer ATH-Heinl GmbH & Co. KG
connection".).
"Test
book".