Figure 2 WDMP sc overview—CLF10 or CLT10 chlorine analyzer
1 Inductive conductivity probe option
2 Turbidity sensor
3 Service bracket
4 CLF10 or CLT10 flow cell
5 Junction box
6 Controller
2.4 Product components
Make sure that all components have been received. Refer to the list that follows. If any items are
missing or damaged, contact the manufacturer or a sales representative immediately.
• WDMP sc panel—Refer to
• Startup kit for WDMP sc—Refer to
8 English
Figure 1
on page 7 or
Figure 3
and the list that follows.
7 CLF10 or CLT10 gateway
8 Standpipe and sample manifold
9 Standard conductivity probe
10 Pressure sensor
11 Sample flow valve
12 Drain manifold
Figure 2
on page 8.