Hach WDMP sc Manual Del Usuario página 18

Ocultar thumbs Ver también para WDMP sc:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Figure 10 Sample and drain connections
1 Sample flow valve
Section 4 Startup
Make sure that all of the electrical and plumbing connections are complete before startup.
1. Open the flow valve on the sample line to let sample flow through the plumbing system. Make
sure that the flow rate and pressure are within the limits. Refer to
2. Examine the plumbing for fluid leaks. Stop the leaks if found.
3. Apply power to the junction box. Refer to
4. Apply power to the controller. Refer to
sensors show on the display.
5. Use the controller to configure the system. Refer to the controller user manual.
6. Start the prime operation for the chlorine anaylzer reagents, if applicable. Refer to the
CL17 chlorine analyzer user manual for instructions.
7. Calibrate the turbidity sensor, the pH probe and the conductivity probe. Refer to the turbidimeter
and probe user manuals for calibration instructions.
8. Let the panel operate for 4 to 6 hours to make sure the readings are stable.
18 English
2 Sample line
Figure
11.
Figure
11. The display light comes on. The connected
3 Drain tubing
Specifications
on page 3.
Tabla de contenido
loading

Tabla de contenido