Leviton Opt-X Ultra 5R1UH-S03 Instrucciones De Uso página 6

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

CABLE INSTALLATION - PREPARATION
Top View: Tray to Front
NOTE: Tray in forward position, covers
and center bar removed for clarity.
Secure to Tray
Pictured: Removable tray to facilitate field
termination and splicing
Page 6 of 26
Secure to Enclosure
Multi-Strand
NOTE:
• Route cable to tray through grommet on the opposite
side of cable entry.
• Plan for cable routing prior to termination.
• Adjust fiber ring kit based on desired application (see
page 7 for detail).
• Assure cable slack for tray movement.
• For additional cable slack management, use optional
Fiber Management Ring Kit (5R100-14R). See image
below for detail on placement.
To remove tray from enclosure, slide tray fully rearward, then
lift front pin to release the tray (pull to slide tray to the rear).
Pictured: Center bar removal - detail view
To remove center steel support bar, depress latch as
shown per arrow in diagram below.
NOTE:
• Do not remove bar
before installing
enclosure in rack.
• Center bar is required
for operation of the
removable covers.
• Replace center bar when
service is complete.
PK-93470-10-02-0A
Tabla de contenido
loading

Este manual también es adecuado para:

Opt-x ultra 5r2uh-s06Opt-x ultra 5r4uh-s12

Tabla de contenido