S&P CTB ECOWATT PLUS Manual Del Usuario página 36

Idiomas disponibles

Idiomas disponibles

Outputs
GND, N,
(J2)
EN
RELÉ (J3)
0V, +V (J7)
TACOM (J8)
A, B (J10)
RS485 (J12)
Micro switches
SW1
SW2
5. OPERATION WITHOUT PROSYS ECOWATT CONSOLE
Roof fans CTB, CRHB/CRVB-N ECOWATT PLUS are ready to work on constant pressure mode (COP/PI PRESSURE) with a di-
fferential pressure reading taken on inlet side and a predefi ned set point from factory (100Pa).
6. OPERATION WITH PROSYS ECOWATT ACCESSORY CONSOLE
Acquiring the PROSYS ECOWATT console offered as an optional accessory, you will have access to the following operation
modes:
• Constant pressure system ( PI PRESSURE/COP ) with modifi able set point parameters.
• Constant airfl ow system ( PI VOLUME/CAV ) with modifi able set point parameters.
• Variable airfl ow system ( PROPORTIONAL/VAV ) (it is necessary to install an external sensor with an output analog signal
0-10V or 4-20mA).
• MIN/MAX operating system (it is necessary to install an external sensor with an output digital signal, time clock or external
relay).
6.1. INSTALLATION
It is possible to install a single PROSYS ECOWATT console linked with one CTB/CRHB/CRVB-N ECOWATT PLUS, or make a
Modbus communication network linking more than one unit with one PROSYS ECOWATT console.
Individual control wiring diagram
36
Description
Internal board power supply passing through ON/OFF switch (Factory wired)
Commutate if any alarm is activated (2A maximum load)
Output analog signal 0-10V to the motor
Pulse motor
Network connection. Modbus protocol
Network connection. Modbus protocol
Description
End of line resistor. Exclusive use for Modbus communication network
SW2-2: enable cannel change
PROSYS ECOWATT
loading

Este manual también es adecuado para:

Crhb-n ecowatt plusCrvb-n ecowatt plus