Allied Telesis AT-GS900/16 Guia De Instalacion página 30

Chapter 2: Installation
Powering On the Switch
All manuals and user guides at all-guides.com
To apply power to the AT-GS900/16, AT-GS900/24 switches, perform the
following procedure:
1. Apply AC power to the switch by plugging the power cord into the AC
power connector on the back panel of the unit, as illustrated in
Figure 6.
Warning
Power cord is used as a disconnection device: To de-energize
equipment, disconnect the power cord.
Figure 6. Connecting the AC Power Connector to Switch
2. Plug the other end or the power cord into a wall outlet.
3. Verify that the POWER LED is green. If the LED is OFF, refer to
"Troubleshooting" on page 31.
The switch is ready for network operations.
5
1 0 0 - 2
4 0 V A
~
C
612
30
loading

Este manual también es adecuado para:

At-gs900/24