Allied Telesis AT-GS900/16 Guia De Instalacion página 20

Chapter 2
Installation
All manuals and user guides at all-guides.com
This chapter contains the following sections:
"Reviewing Safety Precautions" on page 21
"Selecting a Site for the Switch" on page 22
"Planning the Installation" on page 23
"Unpacking the Switch" on page 24
"Installing the Switch on a Table or Desktop" on page 25
"Installing the Switch in a Rack" on page 27
"Cabling the Switch" on page 29
"Powering On the Switch" on page 30
20
loading

Este manual también es adecuado para:

At-gs900/24