Riello RS4D Instrucciones De Instalación, Uso Y Mantenimiento página 20

Quemadores de gas con aire soplado
Idiomas disponibles

Idiomas disponibles

5.7.4
Air damper servomotor adjustment
First stage - CAM I
Cam I (Fig. 15) adjusts, using the micrometric screw, the position
of the 1st stage damper (factory calibration reference value 25°).
Second stage - CAM II and CAM III
Cam II (Fig. 15) adjusts the position of the 2nd stage damper (fac-
tory calibration reference value 50°, do not exceed 65°).
Cam III (Fig. 15) commands the opening of the 2nd stage valve
(factory calibration reference value 35°).
Cam II should always be anticipated by at least 15°.
CAM V
Cam V (Fig. 15) is positioned in the factory (factory calibration ref-
erence value 90°).
Do not tamper with this adjustment for any reason.
5.8
Positioning the probe - electrode
 Make sure that the plate 3)(Fig. 16) is always inserted in the
flattening of the electrode 1)(Fig. 16).
 Rest the probe insulator 4)(Fig. 16) against the air diffuser
2)(Fig. 16).
20141174
Installation
D4360
3.5 ±
0.3
D6088
18
GB
Micrometric screws
31 ±
1
3
4
Fig. 15
2
0.3
Fig. 16
loading

Este manual también es adecuado para:

Rs5dRs5df37618663762016376205820052615 ... Mostrar todo