Bosch DHD3614UC Instrucciones De Instalación página 17

Idiomas disponibles

Idiomas disponibles

Remote Blower (see Figures 11 and 12 for
further detail):
A. Remove junction box cover and connect
conduit with 5 wires from remote blower.
Hook up wires per Wiring Diagramm.
Fig. 10. Replace junction box cover.
B. Attach duct transition at mounting holes
with sheetmetal screws.
C. Feed remote blower pigtail through strain
relief.
D. Attach strain relief to downdraft near
junction box.
gure 11 - Remote Blower
Transition
Transition
DHZDHR6
DHZDHR6
Fig. 11 – Remote Blower
All manuals and user guides at all-guides.com
Strain Relief
Remote Blower
Pigtail
Integral Blower VTN600CV2C (see Figures
10 and 12 for further detail):
E. Connect pigtail to downdraft at 6 pin
connector.
F. Run pigtail wires to juntion box.
G. Inside junction box, connect conduit with
five wires from remote blower. Use a
conduit connector to secure.
Note: Blower and duct transition box may
be installed with duct outlet left, down or
right. Install blower or duct transition in
such a way that access panels can be
removed for service.
6 Pin Connector
Junction Box
Conduit To
Remote Blower
17
loading