GreenWorks Commercial GS181 Manual Del Operador página 9

Idiomas disponibles

Idiomas disponibles

5. Put the chain in position and make sure that the loop is
behind the guide bar.
6. Hold the chain and bar.
21
20
7. Put the chain loop around the sprocket (16).
8. Make sure the chain tension pin hole (19) on the guide
bar fits correctly with the bolt (17).
9. Install the chain cover.
10. Tighten the chain. Refer to Adjust the chain tension.
11. Tighten the nuts when the chain is correctly tensioned.
If you start the chain saw with a new chain, have a test for
2-3 minutes. A new chain gets longer after the first use,
examine the tension and tighten the chain if necessary.
22
16 17
19
NOTE
English
8.4
INSTALL THE BATTERY PACK
18
If the battery pack or charger is damaged, replace the
battery pack or the charger.
Stop the machine and wait until the motor stops before
you install or remove the battery pack.
Read and understand the instructions in the battery and
charger manual.
1. Align the lift ribs on the battery pack with the grooves in
the battery compartment.
2. Push the battery pack into the battery compartment until
the battery pack locks into place.
3. When you hear a click, the battery pack is installed.
8.5
REMOVE THE BATTERY PACK
1. Push and hold the battery release button (18).
2. Remove the battery pack from the machine.
9
OPERATION
Remove the battery pack and keep hands clear of the lock
out button when you move the machine.
Examine the chain tension before each use.
9.1
EXAMINE THE CHAIN OIL
Do not use the machine without sufficient chain oil.
1. Examine the oil level of the machine from the oil
indicator.
2. Add oil if necessary.
9
WARNING
NOTE
IMPORTANT
NOTE
EN
loading

Este manual también es adecuado para:

Csb404