VENTE-UNIQUE OTERIA 8X12FT Instrucciones De Montaje página 5

TO PREVENT INJURY, READ AND UNDERSTAND THE GREENHOUSE
ASSEMBLY INSTRUCTIONS BEFORE USE.
Notes:
1. It takes about 2-3 hours to assemble the greenhouse by 2-3 persons.
2.
Make sure the greenhouse is located on a flat, level surface.
3.
Please remember that glass is fragile and should be handled with
extreme care. Always clear up and dispose of any breakages
immediately.
GENERAL SAFETY, WARNINGS AND PRECAUTIONS
KEEP WORK AREA CLEAN AND DRY.
Cluttered, damp or wet work areas invite injuries.
STAY ALERT. Watch what you are doing at all times. Use common sense. Do not use
the greenhouse when you are tired or distracted from the job at hand. It is
recommended to use gloves for assembling the greenhouse.
MAINTAIN THIS PRODUCT WITH CARE.
Keep the greenhouse clean and dry for better performance: maintenance should be
performed regularly.
USE THE RIGHT PRODUCT FOR THE JOB.
Do not attempt to force a small product to do the work of a larger industrial product.
There are certain applications for which the greenhouse was designed. It will do the job
better and more safely in the manner for which it was intended. Do not modify the
greenhouse and do not use the greenhouse for a purpose for which it was not intended.
MAINTAIN A SAFE WORKING ENVIRONMENT.
Keep the work area tidy. Make sure there is adequate surrounding workspace. Avoid
high traffic areas. Always keep the work area free of obstructions, grease, oil, trash and
other debris.
PROPER GREENHOUSE LOCATION.
Make sure the greenhouse is located on a flat, level surface.
loading