Powerworks PRL110 Manual Del Operario página 9

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 58
Installation
Installing and Connecting the Charging Station
>1m
>3m
1. 1.
2.
1m
10m
>1m
35cm
Position for the charging station as follows:
In a level spot out of direct sunlight
(The front end of the charging station must not be 5 cm higher or
lower than the back end.)
Within reach of a wall socket
(The low voltage cable is 10 m long.)
With at least 3 m in front of it and 1 m to each side
(Do not position in confined spaces in the operating area.)
The majority of the charging station must be inside the operating area.
The following two options are shown in figure:
Option 1 - Charging station is completely inside the operating area.
Option 2 - Charging station partly outside the operating area.
EN
9
POWERWORKSTOOLS.COM
loading

Este manual también es adecuado para:

Prl115