Preparing For Commissioning; Perform Commissioning - KNF Labor N022.18 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 178
Setup and connection
26

6.1 Preparing for commissioning

Before turning on the pump, make sure of the following
points:
Necessary operating requirements
Pump
- Connect all hoses correctly
Pump
- Data of the voltage supply system are consis-
tent with the details on the type plate of the
power supply.
- Pump outlet not closed or restricted.
Pump
- Fan opening not blocked.
Tab.21: Operating requirements for commissioning

6.2 Perform commissioning

WARNING
Translation of Original Operating Instruction, KNF 121224-121388 04/23
Diaphragm pump N022.18, N026.18
Risk of burns from hot pump parts and/
or hot medium
Some pump parts may be hot during or
after operation of the pump.
à
Allow the pump to cool after opera-
tion.
à
Take protective measures to pro-
tect against touching hot parts.
Tabla de contenido
loading

Este manual también es adecuado para:

Labor n026.18

Tabla de contenido