CAUTION
y The electrical installation of these PCS and battery must only be performed by electricians or
technicians, qualified to install PCS and battery.
y When removing the cover, make sure not to damage connection components.
y After connecting the normal and backup load to the corresponding terminals of ATS, check if
electricity is supplied properly whether the grid alive or outage.
y Refer to the ATS BOX manual at the following site for detailed information on installing ATS
BOX.
https://enwitec.eu/
Connection Diagram
GRID
PE
BMS2 BAT2
Power
Meter
L1L2L3 N
Battery 2
Battery 1
+
+
BMS1 BAT1
DRM
LAN
LG ESS PCS
USB
Meter
A B
A
B
L1
L1
L1
L2
L2
L2
Energy
L3
L3
L3
Meter
N
N
N
PV
PV
PV
Array
Array
Array
#1
#2
#3
+
+
+
PV1
PV2
PV3
PV
ATS
Grid
Comm.
1 2 3 N
N
L3
L2
L1
Installation
23
Critical Load
Load Output
Output
L1L2L3 N
L1L2L3N
ATS
2
loading

Este manual también es adecuado para:

Ess home 8D010ke1n211D008ke1n211